Following the collapse of the county’s electricity grid, the Central Bank of Nigeria (CBN), is currently providing about $250 million (N103b) for the rehabilitation of critical interfaces between Transmission and Distribution to increase and stabilise power delivery, as part of an emergency approach to ensure the stability of the country’s grid and power system.
Furthermore, this project, will strengthen the interface between the TCN and the DisCos, it is also expected to gulped about N104 billion and spread across critical locations in the country.
However, stakeholders insists that although interventions in the sector, especially the alignment of the interface between TCN and DisCos remains critical, it was high time to ensure that the sector operates optimally without support from the government.
