By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Phoenix RelationsPhoenix RelationsPhoenix Relations
  • Home
  • Categories
    • CrimeUnlimited
    • Economy
    • Education
    • Entertainment
    • HealthHot
    • Exclusives
    • News100+
    • Politics
    • Press Realeases
    • Sports
    • Tech
    • Opinions
  • About
  • Privacy Policy
  • Contact Us
Reading: Repair Works on Lagos–Ibadan Expressway to Last Two Months — FRSC
Share
Sign In
Notification Show More
Font ResizerAa
Phoenix RelationsPhoenix Relations
Font ResizerAa
Search
  • Home
  • About Us
  • Blog
  • Categories
    • Crime
    • Economy
    • Education
    • Entertainment
    • Health
    • Exclusives
    • News
    • Politics
    • Press Realeases
    • Sports
    • Tech
    • Opinions
  • Contact
  • Privacy Policy
Have an existing account? Sign In
Follow US
  • Advertise
© 2024 Phoenix Relations. All Rights Reserved.
Default Blog

Repair Works on Lagos–Ibadan Expressway to Last Two Months — FRSC

Phoenix Relations
Last updated: 7 February 2026 09:54
Phoenix Relations
Share
4 Min Read
SHARE

The Federal Road Safety Corps (FRSC) on Thursday announced that repairs on the Lagos–Ibadan Expressway will require at least two months for full completion.

”Following discussions with the contractor and the Controller of Works, it was agreed that a period of about six weeks to a maximum of two months will be used to complete the work. Some of these repairs need time to properly seal.” The Lagos State Sector Commander of FRSC, Ganiyu Hamzat, revealed in an interview.

According to Hamzat, certain damaged sections of the road have been causing vehicles to collide while trying to dodge oncoming or unsuspecting vehicles.

“We discovered that some of the bad portions of the road cause vehicles, while trying to dodge oncoming or unsuspecting vehicles, to ram into one another, thereby creating unnecessary accidents,” he said.

He noted that progress on ongoing repairs has been slower than expected. “Since work has now started, we observed that if we continue at the pace initially adopted, it will take about twice the time originally scheduled. As a result, we decided to re-strategise, and that is what we are doing now,” Hamzat explained.

“Instead of working on 1 expansion joint at a time, we are now going to work on two expansion joints at a time so that motorists experience the inconvenience once, rather than suffering repeatedly from one section to another. It is better to face it head-on,” he said.

Hamzat highlighted that overloading on the expressway is a major factor contributing to road damage, calling for the use of weigh bridges to prevent vehicles from prematurely destroying the road.

“High-level chemicals are now being used so the repairs can heal faster, reducing the curing period to about seven days before reopening to traffic,” he added.

Work has already been completed on one side of Kara Bridge, and both sides will now be repaired simultaneously.

“By the time this phase is completed, the inward Lagos section of the expressway will be finished, allowing motorists coming into Lagos to heave a sigh of relief,” Hamzat said.

According to him, the FRSC is working in collaboration with other agencies, including LASTMA, the police, the Federal Road Safety Corps, and even the military. He also appealed to motorists tolerate temporary inconveniences for long-term benefits.

“We cannot ignore this situation or continue to witness crashes. The problem must be confronted decisively,” Hamzat stressed.

“Driving against traffic will no longer be tolerated. This is a warning, not an appeal. Anyone caught driving against traffic will be appropriately penalised and, if necessary, prosecuted in a court of competent jurisdiction.”

Hamzat admitted that while construction work inevitably causes some discomfort, the measures being put in place will ensure smoother traffic flow and safer roads in the long term.

You Might Also Like

Nvidia’s board is reportedly ‘not considering’ hiring Jensen

Power Minister Assures Nigerians of Gradual Electricity Restoration as Government Tackles Supply Disruptions

POWER MINISTRY ACKNOWLEDGES ELECTRICITY SUPPLY DISRUPTIONS IN SOME STATES, ASSURES NIGERIANS OF SWIFT RESTORATION

FG Backs Zamfara’s Power Push as Minister Launches State Electricity Policy, Commissions Solar Plants, Breaks Ground for 36 Mini Grids

Rite Foods Breaks into Nigeria’s Top 20 Brands, Climbs to 17th Position in 2026 Ranking

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.

By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Twitter Copy Link Print
Share
Previous Article FCT Strike: NLC, TUC Direct Workers To Resume Work Immediately
Next Article US Pentagon Plans to End Academic Partnership With Harvard, Says Hegseth
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

//

We influence 20 million users and we are the number one  news network on the planet

Stay Connected

235.3kFollowersLike
69.1kFollowersFollow
11.6kFollowersPin
56.4kFollowersFollow
136kSubscribersSubscribe
4.4kFollowersFollow
- Advertisement -
Ad imageAd image

Latest News

EU Sanctions Pro-Russian Hacker Group and Propaganda Firm
Press Releases 17 November 2026
Lawyer on the microchip case passcode
Press Releases 17 November 2026
Power Minister Tegbe Reaffirms Tinubu Administration’s Commitment to Improved Electricity Supply
Press Releases 16 November 2026
Promasidor’s Weekly Milk Initiative Brings Fresh Milk to Ikun Pupils, Earns Community and Government Commendation
Press Releases 11 November 2026

Technology

  • Advertise with us
  • Terms & Conditions
  • Privacy Policy

Health

  • Advertise

Entertainment

Sign Up for Our Weeky Newsletter

Subscribe to our weekly newsletter to get our newest article/news/articles instantly!

Phoenix RelationsPhoenix Relations
Follow US
© 2024 Phoenix Relations. | All Rights Reserved.
Welcome Back!

Sign in to your account

Lost your password?